SUMMARY

This project consisted of a 7 lot mixed use-subdivision, design of new Town of Bayfield roads and utilities, modifications to Bayfield Parkway and design of a large stormwater facility to serve the entire subdivision. Detailed design was also performed for Phase 1 of the development which will consist of 33 townhome units. 

​

A major feature of the existing site was the Schroder Ditch, which bisected the 17 acre parcel. PST Engineering worked with the client and ditch company to design a pipeline to convey the ditch flows from the crossing under US Highway 160 to the Bayfield Parkway crossing.

 

The project broke ground in the fall of 2023.   

LOCATION

Bayfield, CO

YEAR

2022 - Present

CLIENT

Charles Albert

Pine River Commons.png